WELCOME TO AUTOWORKS RACING.COM

CONTACT US AT
619-401-6900

 



 


HOMEABOUT USCURRENT PROJECTSCUSTOM AIRBRUSHMAGAZINE ARTICLESCONTACT

"California CoupeR"

#4 Adam's: Now in build process.

Page #3

before the panels can be welded in place we make a step in the original metal so that the new panels fit flush and look correct.


The panels are held in place with pins until they are welded in.


Under the fender well drivers side.


Dash being preped for custom fab for radio delete.


Inner view of the new front upper and lower arms.


The new tublar Mustang #3 kit has being mocked up and test fitted.


Radio delete panel has been fabed and welded in and ground. 
The lower heater control panel has been marked for cut out.


The new panel has been made and welded into place. The dash is custom metal, the heater controls will be moved to a more suitable place later.


Next we prepped the engine compartment for the modifications
to the firewall, we do not need any of the old factory holes.


We also started work on the battery box cover panel.


All of the factory holes have been welded up and ground down
ready for body work.


The new battery cover panel has been fabed and laid in
place for test fit.


A small rust hole in the left rear floor has been cut out and a new piece of metal made ready for welding in.

<BACK | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | NEXT>

BACK TO PROJECT STANGS

All contents, text and pictures of Autoworks International's web site are
Copyright 2006. To copy, written permission must be obtained.

 

HOME     ABOUT US     RETURN POLICY     CUSTOM AIRBRUSH     CURRENT PROJECTS     CONTACT